|
Post by kaseylucas on Dec 2, 2021 9:47:52 GMT -5
I'm new to the "deep pour" but I'm having issue with the time frame to make my "swirl designs" stay in my river board. I've used the clear cast in the past and never had a problem, but this deep pour has me frustrated. I know I need to wait as its a slow set and very thin material...so I do...and then it reaches it's very tacky state and it just seems to never look good. It eventually settles into some kind of design but I'm wondering if there's a way for me to control the design any? Magic number of hours set? Tempurature? Would multiple pours be easier? FYI I am pouring roughly 3/8" thick.
|
|